Profit Point is helping several large chemical manufacturers upgrade their many Aspen SCM scheduling models with a goal to achieving long term support-ability in the new Aspen architecture of ver 8.5. AnĀ Aspen SCM (MIMI) Upgrade is no small undertaking, but we have been helping people manage, support, and enhance their scheduling models for over 20 years.
I have seen many Mimi scheduling models over the last 20 years, in many different businesses, and it is still amazing to me how well these scheduling models work. Their superior applicability is primarily due to creativeness of the their original modelers and their efforts to incorporate all the important aspects of the plants which they schedule, and most that I have seen have remained relevant and useful all these years. Their longevity is due is no small part to the flexibility of the scheduling environment which is Aspen SCM (AKA Mimi). This allows for many minor changes to the tool as equipment characteristics change or are upgraded, or as the business needs change, or indeed as the scheduler changes. This new version retains that flexibility which has made Aspen SCM scheduling models still relevant today.
In previous version changes, Aspen SCM has always been backward compatible; meaning that with nominal effort a newer Aspen SCM version would open an older version’s scheduling model. This was true up to ver 8.x released earlier this year. With this version, the older scheduling models, especially those that were developed in house, will not be able to function properly without a more substantial effort. Version 8.x brings a new XML based architecture and with it a new look and feel, more compatible with today’s applications. In addition, it has some useful new features that can make scheduling easier. Link here https://www.aspentech.com/products/aspen-plant-scheduler/ Aspen SCM remains, in my opinion, the best tool for the job of scheduling plants of all types and sizes. This new version is no break from that long history of being the best, indeed it has just been made even better.
With plants around the world, our customers trust Profit Point to upgrade their effective scheduling models to the latest version of Aspen SCM (Mimi) so they can enjoy many more years of effective scheduling at their plants.
We love doing this work. Call us if you are facing the same upgrade challenge, we may be able to help get you going.
Jim Piermarini